Big Branch South Pump Station Expansion

Engineered by Highfill Infrastructure Engineering, P.C. for City of Raleigh

$1,597,000.00 | Raleigh, NC


Work on this project includes pump station improvements, including demolition, temporary bypass pumping system, one pump with suction and discharge piping, generator, electrical gear, electrical building, permanent bypass pumping connection, two hydraulic channel grinders, ventilation modifications, and site work.

Employees are our greatest resource, and Haren Construction is fully committed to their safety. With our safety program and full-time safety manager, we work hard to provide every employee with safe working conditions. Working in the water and waste treatment field, we partner closely with our clients to ensure the safety of every jobsite and the public at large.