Mountain Home WTP Imps

Work on this project includes construction of the following: clearwell addition; filter gallery secondary exit; filter gallery valve, operator, and piping upgrades and enhancements; yard piping and associated structures improvements, including metering vaults and chemical injection vaults; drainage, associated structures, paving and grading improvements; electrical power distribution improvements; and instrumentation, control and SCADA improvements.

Employees are our greatest resource, and Haren Construction is fully committed to their safety. With our safety program and full-time safety manager, we work hard to provide every employee with safe working conditions. Working in the water and waste treatment field, we partner closely with our clients to ensure the safety of every jobsite and the public at large.