Catawba River Water Pollution Control Facility

Engineered by Freese and Nichols, Inc. for City of Morganton

$8,527,000.00 | Morganton, NC


Work on this project includes demolition of structures, pavements, piping and other improvements to allow new construction; relocation of the plant effluent outfall pipe and de-chlorination vault; construction of two (2) aeration basins, diffusers, air and process piping; construction of a steel frame and masonry building to house process blowers, chemical storage and feed systems, HVAC and electrical equipment; construction of process flow splitter boxes for aeration basins and secondary clarifiers including associated process piping modifications; replacement of RAS and WAS pumps in two pump stations; piping and structure modifications to peak flow storage system; and all associated site work, piping, electrical and instrumentation work.

Employees are our greatest resource, and Haren Construction is fully committed to their safety. With our safety program and full-time safety manager, we work hard to provide every employee with safe working conditions. Working in the water and waste treatment field, we partner closely with our clients to ensure the safety of every jobsite and the public at large.