Incinerator System Rehab & Emissions Upgrade

Work on this project includes demolition and removal of the existing primary heat exchanger, venturi-scrubber, induction fans, ash pumps and gravity belt thickeners and associated ductwork, piping, wiring, and controls; upgrades to the emission control system including, but not limited to installation of a replacement primary heat exchanger, new multi-venturi scrubber system with sorbent polymer composite filter unit, access platform system and ancillary systems to support the multi-venturi scrubber including water supply piping, drain piping, electrical and instrumentation systems; new ash transfer pumping equipment from the multi-venturi scrubber to the existing ash clarifier; replacement ash pumping equipment from the ash clarifier to the existing lagoon at the facility; modification to the existing purge air blower piping; installation of new panelboard and associated electrical equipment to power the new emission control equipment; and installation of a new PLC control panel for the new emission control system and modification to the existing SCADA system.

Employees are our greatest resource, and Haren Construction is fully committed to their safety. With our safety program and full-time safety manager, we work hard to provide every employee with safe working conditions. Working in the water and waste treatment field, we partner closely with our clients to ensure the safety of every jobsite and the public at large.